The Clariden School STEAM Addition is located across the street from Bob Jones Park, just south and west of Grapevine Lake. The new addition is connected to the existing campus by a covered walkway, matching the existing campus connections. The major goal of the design process is the flexible layout of the building. The program includes a maker-space, science lab, teaching spaces, conference room, and collaboration areas.
PROJECT SCOPE:
Size: 16,736 SF
Budget: $5.8M
Completion Date: Fall 2022
Location: Southlake, TX
OWNER:
The Clariden School of Southlake
Contractor:
Steele & Freeman, Inc.