This project features a complete reconstruction of the previous Dallas College Eastfield Campus’s aquatic center. Mesquite ISD, in partnership with the City of Mesquite, will manage and utilize this new natatorium for MISD students and Mesquite residents. The pool will undergo significant updates which will expand its width and include new features such as two diving boards, (8) 25 yard swim lanes, (6) 25 meter swim lanes, new tile, updated pool finish, and competition ready Myrtha gutter system. This facility will also feature a transparent OpenAire aluminum structure to enclose the pool for use on cold or wet days, while having the ability to open the walls and roof during good weather.
PROJECT SCOPE:
Size: 13,580 SF
Budget: $9,700,000
Completion Date: Spring 2024
Location: Mesquite, TX
OWNER:
Mesquite Independent School District
CONTRACTOR:
Lee Lewis Construction