Sigler Elementary School

Fall 2009

This project is a replacement school on the same site, carefully designed to save a grove of mature trees and constructed with school in session. The existing school had outlived its useful life and was beyond economic repair. A replacement was the most economical solution both short-term and long-term. The new building is situated in a corner to increase green space on the property.