This new elementary school will bridge the gap between maintaining equality with the existing elementary schools in the district and the future of Anna ISD. The two-story classroom wing is designed to support up to 800 students in grades Pre-K through 5. With daylight as a priority, the building provides exterior windows for every classroom. The overhead high windows allow for light to fill the Media Center, which is positioned as the core of all the academic spaces. There is physical and visual connection to the media center on both levels to promote the multifunctional use of this space, and dedicated spaces for Art, Music, Special Education, and Science are positioned to provide ease of access.
The exterior play areas are nestled into the building perimeter to promote a safe and secure play area while providing excellent visual oversight by staff. The building also extends overhead to provide cover for the play equipment during inclement weather.
The public side of the building includes offices, a light-filled cafeteria, and a gymnasium that is also designed to serve as a storm shelter. This school opened in the fall of 2022.
PROJECT SCOPE:
Size: 85,000 SF
Budget: $22,000,000
Completion Date: Fall 2022
Location: Anna, TX
OWNER:
Anna Independent School District
CONTRACTOR:
Lee Lewis Construction