Florence Black Elementary School
Mesquite, TX
Summer 2013
Onsite replacement of a 1950s school that had multiple buildings connected by open covered sidewalks and classrooms opening directly outside. Operable windows, a low slung wood frame structure and an inadequate original foundation made upgrades impractical, and a full replacement school became the most practical long-term solution. The new school is highly efficient with a Geothermal HVAC system. Cafetorium, library and gym are accessible to the public for after-hours use.
| Project Name | Black Elementary School |
| Size | 82,640 SF |
| Budget | $15,000,000 |
| Completion Date | Summer 2013 |
| Location | Mesquite, Texas |
| Owner | Mesquite Independent School District |
| Contractor | Pogue Construction |